Industrial manufacturing

What happens after hours?

Skilled people are harder to find, competition keeps rising, and new lines cost millions. The fastest gains are already on your floor, in losses nobody can see.

  • On assembly line 2, Kasqade flags a 42-second conveyor stop while the workers stay anonymised (sample data)
  • A factory hall with its machine lines running and the walkway clear, marked as running by Kasqade (sample data)
  • Four CNC machines run until CNC 04 stands idle for six minutes with no operator, and Kasqade notifies the operator (sample data)
  • A robot places parts in a cell, and Kasqade flags a 12.9-second cycle against a 12-second target (sample data)
SITE 01 · WATCHED RIGHT NOW · 14 CAMERASSAMPLE DATA4lines running12machines9people, anonymised2stops today

The problem

You’re already paying for the output you’re missing.

THE CAPACITY YOU PAY FOR · 100%What you produce · 58%Stops logged as “other” · 14%Slow cycles · 12%Night shift losses · 10%Other losses · 6%HIDDEN CAPACITY · SAME TEAM, SAME LINES
THE CAPACITY YOU PAY FOR · 100%
  • What you produce58%
  • Stops logged as “other”14%
  • Slow cycles12%
  • Night shift losses10%
  • Other losses6%
  • Hidden capacity · same team, same lines

Line stops and jams →Machine idle time →Visual root cause →Safety →

Average OEE 55 to 60% · Evocon, 2024 · Split of losses is illustrative

The solution

Every shift, on the record.

Video AI that turns the cameras on your floor into a record of every stop, cycle and warning sign, day and night, with the clip.

The return

What catching it early is worth

$124,669

for every hour of unplanned downtime at a typical plant

ABB, 2023

27 h

a month of production lost to unplanned downtime at the average large plant

SIEMENS, 2024

7 days

to have every line on record, on the cameras you already have

74%of European plants face unplanned outages on critical equipment at least once a monthABB, 2023 · EUROPE

See a sample manufacturing report

Integrations

One event. Every system that needs it.

KASQADE DETECTSLine 3 stoppedCause: material jam at infeedCLIP ATTACHED
  • Teams · shift lead pinged✓ 14:02:04
  • PLC (OPC UA) · andon light on at line 3✓ 14:02:04
  • MES · stop reason filled in: jam at infeed✓ 14:02:05
  • CMMS · work order raised: 3rd jam this shift✓ 14:02:05
  • ERP · production order 4411 delayed 6 min✓ 14:02:06

FAQ

What manufacturing teams ask first

Something else on your mind? Talk to our team.

Industrial manufacturing